project contracting
Integrated deodorization technology
Combined integrated deodorization technology
The combined integrated deodorization system is a new and advanced intelligent deodorization equipment developed by our company on the basis of introducing advanced Japanese deodorization technology and combined with domestic usage scenarios, featuring wide application scenarios, flexible layout, and a simple and consistent appearance. It can meet the high-efficiency deodorization needs of various occasions such as municipal sewage treatment plants, sewage lifting pump stations, and waste transfer stations.
Core principle
(2) Filled with high-efficiency deodorizing fillers, including humus bio-adsorption deodorizing fillers and dry chemical filter media, it combines the effects of physical adsorption deodorization and chemical deodorization. It has a high purification efficiency for high, medium, and low concentrations of malodorous gases. The filter media has a long service life and is convenient for replacement and maintenance.
(3) Using deodorizing agents to wash the malodorous gas further reduces the odor concentration, and at the same time can sterilize the purified air, effectively reducing harmful microorganisms in the exhaust gas.Applicable scenarios
Performance statement
| No. | Project Name | Specification | Project Location | Remarks |
| 1 | Deodorization of Yuhang Water Affairs No. 4 Pump Station | 5000 m³/h | Hangzhou, Zhejiang | Combined integrated deodorization |
| 2 | Deodorization Upgrade and Transformation of Shanghai Sanlin No. 1 Pump Station | 4000 m³/h | Shanghai | Combined integrated deodorization |
| 3 | Deodorization Equipment for High-end Community Project in Sharjah University City, UAE, Phase I | 10000 m³/h | UAE | Combined integrated deodorization |
| 4 | Deodorization of Jingdong and Jingxi Detention Basins | 14000 m³/h | Shanghai | Combined integrated deodorization |
| 5 | Changliu Sewage Treatment Plant Expansion and Extension Project | 20000 m³/h | Haikou, Hainan | Biological Deodorization + Dry Chemical Deodorization |
| 6 | Suichuan County Second Domestic Sewage Treatment Plant and Supporting Pipe Network Construction Project | 36000 m³/h | Ji'an, Jiangxi | Biological Deodorization |
| 7 | Sewage Treatment Project in Poli Town, Huangdao District, Qingdao | 19000 m³/h | Qingdao, Shandong | Biological Deodorization |
| 8 | Sewage Treatment Center of Tai'an High-tech Zone New Material Industrial Park | 25000 m³/h | Tai'an, Shandong | Biological Deodorization |
| 9 | Jinyinhu Water Quality Improvement and Consolidation Project - Detention Basin Equipment | 32000 m³/h | Wuhan, Hubei | Ion Deodorization |
| 10 | Chongxin County Jinping Town Sewage Treatment Plant Construction Project | 13000 m³/h + 11000 m³/h | Pingliang, Gansu | Chemical Scrubbing + Biological Deodorization |
| 11 | Expansion Project of Qionghai City Jiaji Urban Area Sewage Treatment Plant | 22000m³/h + 2000m³/h | Qionghai, Hainan | Biological Deodorization |
| 12 | Handan Feixiang District Sewage Treatment Plant Engineering | 12000 m³/h | Handan, Hebei | Chemical Scrubbing + UV |